Delivery planning

Oversized Glass: Packing and Unloading Requirements

Oversized glass can be ready to fabricate before a site is ready to receive it. Share vehicle, crate and unloading constraints with the glass quotation so they can be reviewed alongside the panel sizes.

Check the receiving limits before the order

Ask the receiving team for the permitted delivery vehicle, access route, unloading time, storage space and any per-crate size or gross weight limit. Confirm the equipment and competent team designated to unload and move the glass. Ask them to review the proposed packing and lifting plan with the supplier or logistics team.

Align crate marks with panel marks and installation sequence

Send each panel mark, size, thickness or build-up and quantity. Explain whether packages must be grouped by phase, elevation or destination. Ask for estimated crate dimensions and gross weights as part of the offer, and identify which figures will be confirmed before shipment.

Agree on the delivery documents and handoff

Ask who provides the packing list, crate identifiers and order-to-crate mapping. Share any hold points for inspecting packaging before the consignment leaves. Include unloading responsibility and delivery terms on the quotation.

Add the delivery scope to the RFQ

List panel sizes, quantities, destination, anticipated container or vehicle constraints and limits confirmed by the receiving team. Note any unknowns so the quotation can show its delivery assumptions.

Project questions

Can packing be arranged before the site confirms its unloading limits?

Share the known constraints for a preliminary review. Confirm the limits and responsibilities with the receiving team before finalising packing and shipment.