Check the receiving limits before the order
Ask the receiving team for the permitted delivery vehicle, access route, unloading time, storage space and any per-crate size or gross weight limit. Confirm the equipment and competent team designated to unload and move the glass. Ask them to review the proposed packing and lifting plan with the supplier or logistics team.
Align crate marks with panel marks and installation sequence
Send each panel mark, size, thickness or build-up and quantity. Explain whether packages must be grouped by phase, elevation or destination. Ask for estimated crate dimensions and gross weights as part of the offer, and identify which figures will be confirmed before shipment.
Agree on the delivery documents and handoff
Ask who provides the packing list, crate identifiers and order-to-crate mapping. Share any hold points for inspecting packaging before the consignment leaves. Include unloading responsibility and delivery terms on the quotation.
Add the delivery scope to the RFQ
List panel sizes, quantities, destination, anticipated container or vehicle constraints and limits confirmed by the receiving team. Note any unknowns so the quotation can show its delivery assumptions.
Project questions
Can packing be arranged before the site confirms its unloading limits?
Share the known constraints for a preliminary review. Confirm the limits and responsibilities with the receiving team before finalising packing and shipment.