Agree on the inspection conditions before ordering
Record the project acceptance criteria, observation distance and lighting where specified, edge visibility and the approved sample if applicable. Ask which factory checks or photographs should be included with the supply. Use the agreed project criteria for acceptance decisions.
Identify the panel and record what is visible
Record the crate and panel mark, drawing revision and build-up. Take one overview photo and a close view with a scale, describing the location relative to the edge, size, number and appearance. Document whether the feature was first seen before unloading, after unpacking or after installation.
Keep edge exposure and adjacent materials in the record
Note whether edges are exposed and record relevant moisture conditions and materials in contact with the laminate. Edge haze, bubbles or separation require review of the product and installation details. Agree on disposition with the responsible project team and supplier.
Include inspection requirements in the initial quotation
For a new order, send the build-up, edge condition, panel list and required inspection evidence. Include any specific packaging checks and approval hold points that should be priced.
Project questions
Can a photograph alone decide whether a panel meets the specification?
A photo helps identify the panel and explain the observation. Compare it with the agreed criteria and use a project review where the condition or cause is unclear.
YOUR PROJECT, YOUR DRAWINGS
Send your laminated-glass inspection requirements
Include your application, glass build-up, approximate quantities and delivery destination. Email drawings separately and identify the revision.
